建筑工程匯報(bào)總結(jié)ppt模板
建筑工程匯報(bào)總結(jié)ppt模板":[{"c":{"ix":0,"iy":0,"iw":893,"ih":1263},"p":{"h":1263,"w":893,"x":0,"y":0,"z":1},"ps":{"_drop":1},"s":null,"t":"pic"},{"c":{"ix":0,"iy":1268,"iw":606,"ih":440},"p":{"h":440,"opacity":1,"rotate":0,"w":622.425,"x":135,"x0":135,"x1":135,"x2":757.425,"x3":757.425,"y":115.949,"y0":567.899,"y1":115.949,"y2":115.949,"y3":567.899,"z":2},"ps":null,"s":{"pic_file":"/home/iknow/conv//data//bdef//131554970//131554970_2_2.png"},"t":"pic"},{"c":{"ix":0,"iy":1713,"iw":606,"ih":438},"p":{"h":438,"opacity":1,"rotate":0,"w":622.425,"x":135,"x0":135,"x1":135,"x2":757.425,"x3":757.425,"y":585,"y0":1034.849,"y1":585,"y2":585,"y3":1034.849,"z":3},"ps":null,"s":{"pic_file":"/home/iknow/conv//data//bdef//131554970//131554970_2_3.png"},"t":"pic"}],"page":{"ph":1262.879,"pw":892.979,"iw":893,"ih":2151,"v":6,"t":"1","pptlike":false,"cx":0,"cy":0,"cw":892.979,"ch":1262.879}})
擴(kuò)展閱讀:土建工程竣工驗(yàn)收總結(jié)報(bào)告格式
××工程竣工驗(yàn)收質(zhì)量自評(píng)報(bào)告
編制人:審核人:審批人:
××工程竣工驗(yàn)收自評(píng)報(bào)告(范本)
尊敬的各領(lǐng)導(dǎo):
你們好!首先我謹(jǐn)代表××工程所有建設(shè)者對(duì)各位領(lǐng)導(dǎo)的蒞臨表示熱烈的歡迎,現(xiàn)就本工程的施工情況向在座的各位領(lǐng)導(dǎo)進(jìn)行匯報(bào)。匯報(bào)分為工程概況、施工依據(jù)、施工組織情況、現(xiàn)場(chǎng)質(zhì)量控制措施、主要施工過(guò)程控制情況、安全文明施工及獲得的榮譽(yù)、工程技術(shù)資料整編情況、工程質(zhì)量評(píng)定等八個(gè)部分。
一、工程概況(主要講述工程所處的地理位置、各施工有關(guān)單位、該工程的基本情況、工程特點(diǎn)、工程的開(kāi)工時(shí)間、××階段完成時(shí)間)
建設(shè)單位:設(shè)計(jì)單位:勘察單位:監(jiān)理單位:施工單位:監(jiān)督單位:
工程位于×××××,由××樓及××裙房組成,總建筑面積為××m2!翗堑叵隆翆樱厣稀翆,建筑高度為××m。本工程系××結(jié)構(gòu),抗震設(shè)防裂度為×度,人防等級(jí)為×級(jí)。本工程地下處理采用××××樁,梁板式筏型基礎(chǔ),地下一層作為汽車(chē)車(chē)庫(kù)及部分設(shè)備用房;地上×層裙房為商業(yè)用房;×層為住宅樓(或辦公用房)。樓內(nèi)設(shè)有高低壓配電系統(tǒng)、給排水系統(tǒng)、通風(fēng)系統(tǒng)、集中供暖地輻射系統(tǒng)、消火栓和自動(dòng)噴淋系統(tǒng)、電梯系統(tǒng)和車(chē)庫(kù)管理、樓宇監(jiān)控、通信網(wǎng)絡(luò)、信息網(wǎng)絡(luò)、火災(zāi)自動(dòng)報(bào)警和消防聯(lián)動(dòng)等智能化系統(tǒng),設(shè)施齊全、功能先進(jìn)、節(jié)能顯著。
本工程自××年×月×日開(kāi)工,至××年×月×日順利竣工。施工進(jìn)度滿足合同工期的要求,施工過(guò)程中未發(fā)生質(zhì)量、安全事故,未發(fā)生拖欠農(nóng)民工工資事件。二、施工依據(jù)
1、建設(shè)單位與施工單位簽訂的施工合同;
2、本工程經(jīng)審查合格的施工圖紙及設(shè)計(jì)單位出具的設(shè)計(jì)變更單;3、國(guó)家、行業(yè)現(xiàn)行法律法規(guī)及相關(guān)建筑施工驗(yàn)收規(guī)范、質(zhì)量評(píng)定標(biāo)準(zhǔn);4、國(guó)家現(xiàn)行頒布的強(qiáng)制性標(biāo)準(zhǔn);
5、施工單位經(jīng)審批的施工組織設(shè)計(jì)及各專(zhuān)項(xiàng)施工方案;6、中天建設(shè)集團(tuán)綜合管理體系手冊(cè)、程序文件及施工工藝標(biāo)準(zhǔn)。三、工程施工概況
(一)施工組織與管理(介紹本項(xiàng)目部的施工組織與管理的體系,以下樣文僅供參考)1、在開(kāi)工之初,就明確了“確保雁塔杯,爭(zhēng)創(chuàng)長(zhǎng)安杯”的質(zhì)量目標(biāo)。建立了質(zhì)量責(zé)任制,根據(jù)
第1頁(yè)共10頁(yè)
公司《綜合管理體系程序文件》和《質(zhì)量創(chuàng)優(yōu)計(jì)劃》把質(zhì)量工作落實(shí)到各個(gè)職能人員和各個(gè)工作崗位,各行其職,各盡其責(zé),對(duì)工序和工程負(fù)責(zé)到底。
2、抽調(diào)一批項(xiàng)目骨干組成強(qiáng)有力的項(xiàng)目經(jīng)理部及管理班子,落實(shí)經(jīng)項(xiàng)目經(jīng)理負(fù)責(zé)制,選調(diào)業(yè)務(wù)素質(zhì)高,施工經(jīng)驗(yàn)豐富,責(zé)任心強(qiáng)的專(zhuān)業(yè)施工隊(duì)伍施工。
3、強(qiáng)化創(chuàng)優(yōu)意識(shí),在全體管理和施工人員中開(kāi)展創(chuàng)優(yōu)目標(biāo)教育努力使創(chuàng)優(yōu)目標(biāo)活動(dòng)深入人心。(二)技術(shù)管理情況
工程開(kāi)工前,組織項(xiàng)目部施工技術(shù)人員熟悉、審查設(shè)計(jì)圖紙,進(jìn)行圖紙會(huì)審;并由技術(shù)負(fù)責(zé)人組織編制好施工組織設(shè)計(jì),報(bào)公司總工程師及監(jiān)理單位審批,通過(guò)后方可進(jìn)行施工。在每個(gè)分項(xiàng)工程施工前,由技術(shù)負(fù)責(zé)人編制專(zhuān)項(xiàng)施工方案,并組織施工員向施工班組長(zhǎng)進(jìn)行質(zhì)量技術(shù)交底。各班組長(zhǎng)負(fù)責(zé)在每天作業(yè)前向本班職工進(jìn)行施工交底,嚴(yán)格執(zhí)行技術(shù)質(zhì)量保證措施。項(xiàng)目部制定各項(xiàng)技術(shù)管理制度和技術(shù)資料管理制度,保證有關(guān)技術(shù)工作正常運(yùn)行。
(三)質(zhì)量管理制度
1、編制并執(zhí)行了創(chuàng)優(yōu)計(jì)劃和各分部分項(xiàng)的作業(yè)指導(dǎo)書(shū),加強(qiáng)過(guò)程控制和工序管理,實(shí)行“三檢制”,及時(shí)完整地做好了質(zhì)量記錄和驗(yàn)評(píng)資料。
2、執(zhí)行公司綜合管理體系程序文件,建立項(xiàng)目質(zhì)量保證體系和建立各級(jí)質(zhì)量責(zé)任制來(lái)明確質(zhì)量責(zé)任。
3、加強(qiáng)施工過(guò)程控制,嚴(yán)把原材料復(fù)試和成品、半成品質(zhì)量關(guān),嚴(yán)格控制工序質(zhì)量,嚴(yán)格實(shí)施隱蔽工程驗(yàn)收,每個(gè)分部、分項(xiàng)工程的關(guān)鍵工序(位置)設(shè)立質(zhì)量管理點(diǎn),貫徹實(shí)行自檢互檢和交接檢制度。
4、嚴(yán)格執(zhí)行樣板間引路制度。樣板間的施工由各專(zhuān)業(yè)工種技術(shù)過(guò)硬的施工人員承擔(dān),提高樣板自身質(zhì)量水平,以樣板工程帶動(dòng)工程質(zhì)量全面提高。
5、在施工隊(duì)伍的組建上,選擇施工經(jīng)驗(yàn)豐富的技術(shù)型操作工人參與施工,推行工程施工質(zhì)量獎(jiǎng)罰制度。對(duì)班組承包價(jià)格采用固定單價(jià)加浮動(dòng)單價(jià),根據(jù)各個(gè)分項(xiàng)的施工質(zhì)量進(jìn)行獎(jiǎng)罰。
6、認(rèn)真做好各類(lèi)計(jì)量器具及檢測(cè)設(shè)備的檢定工作,使其所有檢測(cè)數(shù)據(jù)和檢測(cè)結(jié)果更具有效性、可靠性。
7、制定質(zhì)量通病的預(yù)防措施。
8、成立QC小組進(jìn)行技術(shù)難點(diǎn)的現(xiàn)場(chǎng)攻關(guān)。(四)質(zhì)量保證情況
在施工過(guò)程中,我們嚴(yán)把工程原材料、成品及半成品的進(jìn)場(chǎng)關(guān)和驗(yàn)收關(guān),對(duì)進(jìn)場(chǎng)材料實(shí)行臺(tái)帳管理,進(jìn)行收、發(fā)、儲(chǔ)、運(yùn)等環(huán)節(jié)的技術(shù)管理。對(duì)進(jìn)場(chǎng)的鋼材、水泥、普通混凝土小型砌塊及商品砼等材料,首先檢查其生產(chǎn)廠家是否具備相應(yīng)生產(chǎn)資質(zhì);再結(jié)合出廠合格證和質(zhì)量檢測(cè)報(bào)告等質(zhì)保資料,核對(duì)現(xiàn)場(chǎng)材料的質(zhì)量、數(shù)量是否達(dá)到要求;最后在監(jiān)理工程師現(xiàn)場(chǎng)見(jiàn)證取樣情況下,送往××檢測(cè)試驗(yàn)中心試驗(yàn)室進(jìn)行復(fù)試。只有復(fù)試合格后,該批材料方可用于工程上。
1、地基與基礎(chǔ)分部工程所有原材料經(jīng)監(jiān)理公司見(jiàn)證取樣:①進(jìn)場(chǎng)鋼材×噸,試驗(yàn)×組,合格×組;②鋼筋直螺紋套筒連接Φ×的連接接頭×個(gè),共試驗(yàn)×組,合格×組;③鋼筋閃光對(duì)焊連接
第2頁(yè)共10頁(yè)
試驗(yàn)×組,合格×組;④鋼筋電渣壓力焊連接試驗(yàn)×組,合格×組;⑤××防水卷材×卷(或×),試驗(yàn)×組,合格×組;⑥進(jìn)場(chǎng)水泥×噸,試驗(yàn)×組,合格×組;⑦進(jìn)場(chǎng)C×商品砼×m3,標(biāo)養(yǎng)試件×組,試驗(yàn)×組,合格×組;⑧進(jìn)場(chǎng)C×P×商品砼×m3,抗?jié)B試件×組,試驗(yàn)×組,合格×組;⑨土壤擊實(shí)試驗(yàn)×組,合格×組。
2、主體結(jié)構(gòu)及裝飾裝修工程所有原材料經(jīng)監(jiān)理公司見(jiàn)證取樣:①進(jìn)場(chǎng)鋼材×噸,試驗(yàn)×組,合格×組;②鋼筋直螺紋套筒連接Φ×的連接接頭×個(gè),共試驗(yàn)×組,合格×組;③鋼筋閃光對(duì)焊連接試驗(yàn)×組,合格×組;④鋼筋電渣壓力焊連接試驗(yàn)×組,合格×組;⑤××防水卷材×卷(或×),試驗(yàn)×組,合格×組;⑥進(jìn)場(chǎng)水泥×噸,試驗(yàn)×組,合格×組;⑦進(jìn)場(chǎng)C×商品砼×m,標(biāo)養(yǎng)試件×組,試驗(yàn)×組,合格×組;⑧M×混合砂漿×m,試驗(yàn)×組,合格×組;⑨進(jìn)場(chǎng)燒結(jié)普通磚×萬(wàn)塊,試驗(yàn)×組,合格×組;空心磚×萬(wàn)塊,試驗(yàn)×組,合格×組;⑩拉結(jié)筋試驗(yàn)×組,合格×組;⑾外墻面磚拉拔試驗(yàn)×組,合格×組;⑿××防水卷材×卷(或×),試驗(yàn)×組,合格×組。
(五)新技術(shù)應(yīng)用情況
在工程施工過(guò)程中,項(xiàng)目部積極推廣應(yīng)用了建設(shè)部推廣使用十項(xiàng)新技術(shù)中的地基基礎(chǔ)和地下空間工程技術(shù)(如復(fù)合土釘墻支護(hù)技術(shù)等)、高性能混凝土、高效鋼筋與預(yù)應(yīng)力技術(shù)、新型模板及腳手架應(yīng)用技術(shù)、鋼結(jié)構(gòu)技術(shù)、安裝工程應(yīng)用技術(shù)、建筑節(jié)能和環(huán)保應(yīng)用技術(shù)、建筑防水新技術(shù)、施工過(guò)程監(jiān)測(cè)和控制技術(shù)、建筑企業(yè)管理信息化技術(shù)共×項(xiàng)新技術(shù),新技術(shù)的應(yīng)用既保證了工程的施工質(zhì)量,又加快了材料的周轉(zhuǎn),節(jié)約了施工成本,大大縮短了建設(shè)工期,取得了良好的經(jīng)濟(jì)效益和社會(huì)效益。
四、主要施工過(guò)程控制情況
1、本工程主要使用的測(cè)量?jī)x器有:××經(jīng)緯儀、××水準(zhǔn)儀、××垂直儀,各項(xiàng)出廠合格證資料齊全;部分按規(guī)定,送陜西省測(cè)繪計(jì)量中心檢測(cè),均在有效鑒定期內(nèi)。施工測(cè)量放線,由專(zhuān)職施工員嚴(yán)格按照施工定位軸線圖和施工圖放樣。自檢合格后,由技術(shù)負(fù)責(zé)人組織質(zhì)量員、施工員等進(jìn)行定位軸線的復(fù)核,經(jīng)復(fù)核無(wú)誤后再報(bào)監(jiān)理工程師復(fù)檢,復(fù)檢合格后,方可進(jìn)行下道工序施工。軸線位移和標(biāo)高引測(cè)控制在規(guī)定范圍內(nèi)。
2、基礎(chǔ)與主體結(jié)構(gòu)工程1)模板工程
本工程墻柱模板采用組合小鋼模,平板采用多層竹膠板。施工前編制專(zhuān)項(xiàng)施工方案,對(duì)整個(gè)支模體系進(jìn)行驗(yàn)算、受力分析,確保足夠的強(qiáng)度、剛度、穩(wěn)定性,對(duì)鋼管、扣件、槽鋼等材料進(jìn)行強(qiáng)度檢測(cè)。繪制預(yù)埋、預(yù)留洞圖。對(duì)進(jìn)場(chǎng)工人進(jìn)行技術(shù)考核,上崗前做好技術(shù)交底工作,采用樣版引路制度進(jìn)行工程管理。對(duì)施工難度較大的部位,如陰陽(yáng)角、根部、鋼木接頭等部位進(jìn)行重點(diǎn)技術(shù)公關(guān)。地下外墻模板加固采用止水螺桿,確;炷翂γ嫫鸬街旅芊浪饔谩T谥_^(guò)程中加強(qiáng)自檢、互檢,發(fā)現(xiàn)問(wèn)題及時(shí)整改,再交由技術(shù)負(fù)責(zé)人組織質(zhì)量員、施工員等復(fù)核,并做好模板安裝檢驗(yàn)批等資料,及時(shí)報(bào)監(jiān)理公司進(jìn)行復(fù)檢,合格后方可澆搗混凝土。另外做到砼澆搗前檢查、澆搗中復(fù)查、澆搗后核查等項(xiàng)工作,保證混凝土結(jié)構(gòu)的質(zhì)量。模板尺寸偏差按規(guī)范要求驗(yàn)收。
2)鋼筋工程
第3頁(yè)共10頁(yè)
33本工程鋼筋規(guī)格、型號(hào)較多,主要規(guī)格有××、××、××,鋼筋用量較大。鋼筋從進(jìn)場(chǎng)、取樣復(fù)試、制作、綁扎、驗(yàn)收、成品保護(hù)都嚴(yán)格按照規(guī)范和技術(shù)要求進(jìn)行操作,保證了鋼筋分項(xiàng)工程的質(zhì)量。在鋼筋綁扎過(guò)程中嚴(yán)格按照?qǐng)D紙和規(guī)范進(jìn)行綁扎,對(duì)主筋位置、箍筋加密區(qū)范圍、鋼筋的錨固長(zhǎng)度、搭接長(zhǎng)度等嚴(yán)格控制。在定位措施上,墻柱鋼筋分別采用水平定位筋及豎向梯子筋進(jìn)行定位、控制筋距。采用塑料墊片、20*20砼控制筋控制保護(hù)層厚度及墻體截面尺寸;梁、板底筋用砂漿墊塊,面筋用馬凳加短鋼筋固定,控制保護(hù)層。鋼筋綁扎完后,由班組自檢、項(xiàng)目部預(yù)檢合格后,報(bào)監(jiān)理單位進(jìn)行驗(yàn)收,驗(yàn)收合格后簽寫(xiě)隱蔽驗(yàn)收記錄,再進(jìn)入下道工序。在砼澆搗過(guò)程中,避免踩踏板面筋,由專(zhuān)人負(fù)責(zé)鋼筋修整,加綁馬凳筋和支墊砼墊塊,以免鋼筋位移。
3)混凝土工程
為保證結(jié)構(gòu)質(zhì)量,提高文明施工水平,主體全部采用商品砼。配備砼輸送泵車(chē)和布料桿等,滿足施工需要。對(duì)混凝土澆筑采取施工員現(xiàn)場(chǎng)跟蹤檢查,安排專(zhuān)人進(jìn)行塌落度測(cè)試、砼試塊制作等,進(jìn)行全過(guò)程的控制;另外派專(zhuān)人到商品砼攪拌站進(jìn)行現(xiàn)場(chǎng)監(jiān)督,檢查原材料、外加劑質(zhì)量及配合比電子計(jì)量情況,根據(jù)施工要求,及時(shí)調(diào)整砼塌落度。砼澆搗完成后,及時(shí)進(jìn)行灑水養(yǎng)護(hù),不少于14d。砼試塊同條件養(yǎng)護(hù)和標(biāo)準(zhǔn)養(yǎng)護(hù),至齡期做好試壓工作。
4)砌體工程
本工程砌體采用混凝土小型空心砌塊,混凝土空心砌塊的優(yōu)點(diǎn)是自重較輕、強(qiáng)度高、尺寸偏差小,且屬于環(huán)保型材料,采用M×水泥砂漿砌筑。在拌制砂漿過(guò)程中嚴(yán)格控制砂漿配合比,按要求進(jìn)行試塊制作。在砌筑前確立皮數(shù)和規(guī)格搭配,提前種植拉接鋼筋,鋼筋的錨固長(zhǎng)度、種植深度、間距滿足規(guī)范要求,同時(shí)按要求進(jìn)行抗拉實(shí)驗(yàn)。砌筑時(shí)嚴(yán)格控制砂漿的飽滿度、灰縫的厚度,杜絕通縫、串縫,確保墻面的平整度和觀感。墻面與頂棚(梁)交接處用斜磚和三角磚進(jìn)行砌筑。在砌體施工過(guò)程中加強(qiáng)自檢、互檢,嚴(yán)格按照工藝和規(guī)范要求進(jìn)行驗(yàn)收,做好記錄。
5)地下室防水工程
本工程地下防水采用SBC-120聚乙烯丙綸防水卷材,在防水工程的質(zhì)量控制上。第一、確保進(jìn)場(chǎng)材料的質(zhì)量合格。第二、根據(jù)材料的特性和防水的要求編制專(zhuān)項(xiàng)施工方案和技術(shù)交底。第三、注意作業(yè)條件和施工的外部環(huán)境的影響,包括做好基層的處理工作。第四、嚴(yán)格按照規(guī)范和工藝要求進(jìn)行施工。第五、加強(qiáng)自檢互檢,對(duì)起泡、起鼓、松動(dòng)的部位及時(shí)按要求進(jìn)行加強(qiáng)處理。第六、注意成品保護(hù),做好防水保護(hù)層的施工。在施工過(guò)程中,嚴(yán)格按規(guī)范要求進(jìn)行質(zhì)量控制,做好驗(yàn)收記錄。
3、裝飾裝修工程
1)本工程室內(nèi)裝飾工程以白色調(diào)為主,根據(jù)功能要求進(jìn)行合理的色彩轉(zhuǎn)變。整體線條流暢、美觀大方,在滿足使用功能的前提下,力求簡(jiǎn)約。我們通過(guò)合理安排,精心施工,使裝飾工程無(wú)論在內(nèi)在質(zhì)量上,還是觀感上,都取得較為滿意的效果。
a、墻面抹灰:混凝土墻面達(dá)到清水墻效果,直接進(jìn)行披灰,有效的預(yù)防了由于抹灰空鼓等問(wèn)題所造成的質(zhì)量隱患,增加了室內(nèi)有效使用面積。其余后砌墻體在進(jìn)行抹灰施工時(shí),我們嚴(yán)抓工序質(zhì)量,加強(qiáng)自檢、互檢工作,從墻面的基層處理到墻面成型進(jìn)行層層把關(guān),把質(zhì)量隱患控制在萌芽
第4頁(yè)共10頁(yè)
之中。
b、內(nèi)墻飾面:陰陽(yáng)角順直方正、大面積平整,無(wú)空鼓翹面現(xiàn)象。其中衛(wèi)生間墻面采用300mm×600mm陶瓷釉面磚;空調(diào)機(jī)房、風(fēng)機(jī)房、洗衣房采用穿孔板吸音墻面,外刷環(huán)保型乳膠漆;電梯廳墻面采用800mm×800mm拋光磚,門(mén)套采用黑金沙大理石線條,整體立體感強(qiáng)。其余墻面平光內(nèi)墻乳膠漆(亞光)。
c、樓地面:磚面拼縫順直,大面平整,無(wú)空鼓、翹面現(xiàn)象,衛(wèi)生間地面坡度合理、排水順暢。其中衛(wèi)生間地磚采用300mm×300mm防滑陶瓷地磚鋪設(shè);弱電控制室、消防控制室采用抗靜電架空地板,架空高度250mm;公共走廊、室內(nèi)采用800mm×800mm拋光磚;電梯廳采用1000mm×1000mm拋光磚。樓梯踏步采用水泥砂漿壓光,陽(yáng)角處鑲貼銅條護(hù)角,踏步尺寸一致,色質(zhì)均勻。
d、頂棚:電梯廳、走道、風(fēng)機(jī)房采用礦棉吸聲板吊頂,其余頂棚白色乳膠漆飾面。2)門(mén)窗工程
門(mén)窗工程主要有鋁合金門(mén)窗、鋼質(zhì)防盜門(mén)、木質(zhì)防火門(mén)及木門(mén)。鋁合金門(mén)窗安裝采用彈性連結(jié),與墻體之間的縫隙采用發(fā)泡劑填實(shí),外側(cè)四周采用防水膠勾縫。木門(mén)安裝前事先在表面刷清漆一道,注重上下冒頭必須刷油漆,為了防止木質(zhì)夾板門(mén)因溫濕度變化內(nèi)部空氣膨脹容易引起變形的問(wèn)題,木門(mén)安裝好后均在其上冒頭用電鉆開(kāi)一排氣孔。
4、屋面工程:
本工程屋面防水采用三布九涂水乳型氯丁膠乳瀝青防水涂料一道,SBC120聚乙烯丙綸復(fù)合防水卷材(350g/m2)一道,25厚1:3水泥砂漿保護(hù)層,上鋪防潮磚。施工時(shí)在把好觀感質(zhì)量關(guān)的同時(shí),特別注重對(duì)屋面滲漏水質(zhì)量通病的防治,對(duì)防水材料使用前全部進(jìn)行復(fù)試,合格后方準(zhǔn)采用,在落水口、排氣管口等防水的重點(diǎn)部位嚴(yán)格按規(guī)范要求增設(shè)附加層,屋面施工完成后進(jìn)行持續(xù)2小時(shí)淋水試驗(yàn)(或24小蓄水試驗(yàn)),未發(fā)生滲漏水現(xiàn)象。
5、安裝工程
1)采暖與衛(wèi)生工程:(寫(xiě)明分包單位名稱)
管道施工嚴(yán)格招待國(guó)家規(guī)范和行業(yè)標(biāo)準(zhǔn)設(shè)置支、吊、托架及卡箍,保證管件的使用壽命和給排水的效果。排水管道伸縮節(jié)的設(shè)置,在查實(shí)西安地區(qū)氣象資料經(jīng)計(jì)算確定位置與數(shù)量。
穿過(guò)樓地在的管道四周縫隙,用細(xì)石混凝土搗實(shí),管周留深20mm,寬10-20mm凹槽用防水油膏填嵌密實(shí)。在整體樓面管子四周粉出高于30mm的錐體,有效解決了該部位容易滲漏的質(zhì)量通病。衛(wèi)生潔具安裝的成品保護(hù)措施到位,沒(méi)有發(fā)現(xiàn)劃痕及破損等現(xiàn)象。立管套管在樓板底面用黑色橡膠圈作分色處理,彌補(bǔ)了管口部位在觀感上的不足。
2)電器安裝工程:(寫(xiě)明分包單位名稱)
開(kāi)關(guān)、插座面板安裝平整、標(biāo)高準(zhǔn)確、抹灰到位,蓋板與墻面結(jié)合緊密無(wú)縫隙。成排明裝燈具中心線偏差在3mm內(nèi)。配電箱的進(jìn)管孔為壓制孔,進(jìn)線管從規(guī)格適當(dāng)?shù)目字幸M(jìn),順直排列,一孔一管。配電箱內(nèi)相線、工作零線、接地線色標(biāo)分明。導(dǎo)線引出板面有絕緣套管保護(hù),箱(盤(pán))接地牢固緊密。
成套配電柜設(shè)備的型鋼基礎(chǔ)固定間距為0.6m,基礎(chǔ)型鋼穩(wěn)固,與接地線連接的兩端焊口飽滿,
第5頁(yè)共10頁(yè)
長(zhǎng)為扁鋼寬度的2倍,基礎(chǔ)型鋼刷二遍防腐漆。柜盤(pán)找正時(shí)采用0.5mm鐵片進(jìn)行調(diào)整,每處墊片不超過(guò)二片,然后按柜固定螺絲連接。每臺(tái)柜(盤(pán))單獨(dú)與基礎(chǔ)型鋼連接,與接地干線連接可靠。機(jī)房、管井等處的電纜橋架、母線、管道的布排綜合考慮合理利用空間,做到整齊、垂直、標(biāo)志分明。
3)通風(fēng)與空調(diào)工程(寫(xiě)明分包單位名稱)
支架敷設(shè)是確保風(fēng)管安裝質(zhì)量的關(guān)鍵,根據(jù)現(xiàn)場(chǎng)情況和風(fēng)管的重量計(jì)算后確定用料規(guī)格和形式,達(dá)到既節(jié)約鋼材,又保證支架強(qiáng)度的要求。通風(fēng)安裝工程中的各道工序嚴(yán)格按規(guī)范操作,經(jīng)檢測(cè)達(dá)到設(shè)計(jì)要求,使用效果良好。
4)電梯安裝工程(寫(xiě)明分包單位名稱)
本工程共采用×部上海永大日立垂直升降式電梯,分布在樓層兩邊各四部,電梯運(yùn)行平穩(wěn),樓層?课恢脺(zhǔn)確,層門(mén)指示燈盒及召喚安裝位置正確,面板與墻面粘貼牢固密實(shí),橫豎端正。電梯安裝工程各項(xiàng)資料齊全。五、安全文明施工及獲得的榮譽(yù)
在整個(gè)施工過(guò)程中,我們嚴(yán)格執(zhí)行國(guó)家有關(guān)安全生產(chǎn)法律法規(guī);嚴(yán)格執(zhí)行公司頒布的工程管理規(guī)范和CIS形象手冊(cè),實(shí)施施工現(xiàn)場(chǎng)文明標(biāo)化管理。努力做到文明施工、安全生產(chǎn)、不擾民,使職工置身于文明施工的氛圍下。整個(gè)施工過(guò)程中未發(fā)生安全事故。
本工程先后被評(píng)為西安市文明工地、陜西省文明工地;西安市建筑結(jié)構(gòu)示范工程;陜西省優(yōu)秀質(zhì)量管理QC小組×等獎(jiǎng)。六、資料整編情況
工地現(xiàn)場(chǎng)配備專(zhuān)職資料員一名,持證上崗。負(fù)責(zé)對(duì)工程資料進(jìn)行收集和整編歸檔,保證工程技術(shù)資料的及時(shí)、完整和真實(shí)。工程開(kāi)工、竣工形成的各項(xiàng)程序文件;工序施工前、后形成的技術(shù)資料;以及原材料進(jìn)場(chǎng)復(fù)試等質(zhì)保資料等,都及時(shí)進(jìn)行收集,報(bào)監(jiān)理單位備案,以便對(duì)整個(gè)施工過(guò)程進(jìn)行全方位控制。同時(shí)認(rèn)真做好安全資料、文明工地資料及貫標(biāo)資料的收集和整理。七、工程檢測(cè)及專(zhuān)業(yè)驗(yàn)收情況
1、×根鉆孔灌注樁,經(jīng)陜西省建設(shè)工程人工地基工程質(zhì)量直屬檢測(cè)站檢測(cè),承載力均符合設(shè)計(jì)要求,樁身完整性良好,I類(lèi)樁占×%,II類(lèi)樁占×%。2、混凝土抗壓試件
經(jīng)抗壓試驗(yàn)全部合格,并經(jīng)統(tǒng)計(jì)分析評(píng)定全部合格;炷翉(qiáng)度等級(jí)標(biāo)養(yǎng)試件(組數(shù))600℃d同養(yǎng)試件C×3、結(jié)構(gòu)實(shí)體鋼筋保護(hù)層檢測(cè)經(jīng)陜西省建設(shè)工程質(zhì)量監(jiān)督檢驗(yàn)測(cè)試中心檢測(cè):
第6頁(yè)共10頁(yè)
地基與基礎(chǔ)分部檢測(cè)點(diǎn)數(shù)合格點(diǎn)數(shù)合格率梁板主體分部檢測(cè)點(diǎn)數(shù)合格點(diǎn)數(shù)合格率梁板4、本工程沉降觀測(cè)委托××××單位進(jìn)行觀測(cè)。從×年×月×日至×年×月×日對(duì)其共進(jìn)行了×次沉降觀測(cè),最大沉降量××,最大沉降差××,平均沉降量××,平均沉降速率為×/d,結(jié)論為:總體上沉降均勻,未發(fā)現(xiàn)異常情況。5、×個(gè)主體大角垂直度最大偏差為×mm。
6、防雷接地經(jīng)西安防雷電裝置檢測(cè)所檢測(cè):結(jié)論為本工程所檢項(xiàng)目符合要求。
7、各類(lèi)鋁合金窗的型材均按規(guī)定進(jìn)行抽檢,鋁合金窗按規(guī)定進(jìn)行“三性”(氣密性、水密性、抗風(fēng)壓性)試驗(yàn),均符合有關(guān)的標(biāo)準(zhǔn)規(guī)定。
8、外墻面磚共進(jìn)行了61組拉拔試驗(yàn),強(qiáng)度全部合格。
9、室內(nèi)甲醛、苯、TYOC、氨、氡的濃度檢測(cè)結(jié)果符合國(guó)家標(biāo)準(zhǔn)GB50325-201*的要求,室內(nèi)環(huán)境質(zhì)量合格。
10、生活飲用水檢測(cè):經(jīng)西安市疾病預(yù)防控制中心檢測(cè)符合要求。11、人防驗(yàn)收:×年×月×日經(jīng)西安市人防工程質(zhì)量安全監(jiān)督站驗(yàn)收合格。12、消防驗(yàn)收:×年×月×日經(jīng)陜西省公安廳消防局驗(yàn)收合格。13、電梯驗(yàn)收:×年×月×日經(jīng)西安市特種設(shè)備監(jiān)督檢驗(yàn)所驗(yàn)收合格。14、節(jié)能驗(yàn)收:×年×月×日經(jīng)×××驗(yàn)收合格。
七、工程質(zhì)量評(píng)定
(一)、分部工程質(zhì)量評(píng)定
根據(jù)現(xiàn)行施工規(guī)范及陜西省有關(guān)建設(shè)工程技術(shù)資料整編的要求,××工程評(píng)定情況如下:1、地基與基礎(chǔ)工程分部工程分項(xiàng)工程土方開(kāi)挖分項(xiàng)工程土方回填分項(xiàng)工程地基與基礎(chǔ)模板分項(xiàng)工程鋼筋分項(xiàng)工程混凝土分項(xiàng)工程檢驗(yàn)批數(shù)分項(xiàng)工程防水混凝土分項(xiàng)工程卷材防水層分項(xiàng)工程磚砌體分項(xiàng)工程檢驗(yàn)批數(shù)經(jīng)監(jiān)理公司審查所有分項(xiàng)工程全部合格,地基與基礎(chǔ)分部工程于×年×月×日由建設(shè)、監(jiān)理單位組織驗(yàn)收,結(jié)論為合格,同意驗(yàn)收。
2、主體結(jié)構(gòu)工程
第7頁(yè)共10頁(yè)分部工程分項(xiàng)工程模板分項(xiàng)工程鋼筋分項(xiàng)工程檢驗(yàn)批數(shù)主體分部工程混凝土分項(xiàng)工程填充墻砌體分項(xiàng)工程經(jīng)監(jiān)理公司審查所有分項(xiàng)工程全部合格,主體分部工程于×年×月×日由建設(shè)、監(jiān)理單位組織驗(yàn)收,結(jié)論為合格,同意驗(yàn)收。
3、建筑裝飾裝修工程分部工程分項(xiàng)工程建筑裝飾裝修分部工程經(jīng)監(jiān)理公司審查所有分項(xiàng)工程全部合格。4、建筑屋面工程分部工程分項(xiàng)工程建筑屋面分部工程經(jīng)監(jiān)理公司審查所有分項(xiàng)工程全部合格。5、給排水與采暖工程分部工程分項(xiàng)工程建筑給水、排水及采暖分部工程經(jīng)監(jiān)理公司審查所有分項(xiàng)工程全部合格。6、建筑電氣工程分部工程分項(xiàng)工程檢驗(yàn)批數(shù)第8頁(yè)共10頁(yè)
檢驗(yàn)批數(shù)分項(xiàng)工程檢驗(yàn)批數(shù)檢驗(yàn)批數(shù)分項(xiàng)工程檢驗(yàn)批數(shù)檢驗(yàn)批數(shù)分項(xiàng)工程檢驗(yàn)批數(shù)分項(xiàng)工程檢驗(yàn)批數(shù)建筑電氣分部工程經(jīng)監(jiān)理公司審查所有分項(xiàng)工程全部合格。7、智能建筑工程分部工程分項(xiàng)工程智能建筑分部工程經(jīng)監(jiān)理公司審查所有分項(xiàng)工程全部合格。8、通風(fēng)與空調(diào)工程分部工程分項(xiàng)工程通風(fēng)與空調(diào)分部工程經(jīng)監(jiān)理公司審查所有分項(xiàng)工程全部合格。9、電梯工程分部工程分項(xiàng)工程電梯分部工程經(jīng)監(jiān)理公司審查所有分項(xiàng)工程全部合格。9、節(jié)能工程分部工程電梯分部工程分項(xiàng)工程檢驗(yàn)批數(shù)分項(xiàng)工程檢驗(yàn)批數(shù)檢驗(yàn)批數(shù)分項(xiàng)工程檢驗(yàn)批數(shù)檢驗(yàn)批數(shù)分項(xiàng)工程檢驗(yàn)批數(shù)檢驗(yàn)批數(shù)第9頁(yè)共10頁(yè)
分項(xiàng)工程檢驗(yàn)批數(shù)經(jīng)監(jiān)理公司審查所有分項(xiàng)工程全部合格,節(jié)能分部工程于×年×月×日由建設(shè)、監(jiān)理單位組織驗(yàn)收,結(jié)論為合格,同意驗(yàn)收。
(二)、單位工程施工質(zhì)量評(píng)價(jià)
單位工程所含的分部及各子分部工程質(zhì)量,經(jīng)監(jiān)理公司檢查驗(yàn)收,全部合格。質(zhì)量控制資料齊全完整。
主要功能項(xiàng)目的抽查結(jié)果符合相關(guān)專(zhuān)業(yè)質(zhì)量驗(yàn)收規(guī)范的規(guī)定。觀感質(zhì)量自評(píng):好。
綜合以上各項(xiàng)內(nèi)容,并根據(jù)國(guó)家現(xiàn)行《建筑工程施工質(zhì)量驗(yàn)收統(tǒng)一標(biāo)準(zhǔn)》,對(duì)××工程單位工程施工質(zhì)量自評(píng)為合格。
最后我代表北京易成市政工程有限責(zé)任公司,再次感謝××有限公司的大力支持、××質(zhì)量安全監(jiān)督站專(zhuān)家批評(píng)指導(dǎo),××設(shè)計(jì)研究院、××監(jiān)理公司的密切配合。謝謝!
(以上內(nèi)容主要為竣工驗(yàn)收的自評(píng)報(bào)告,基礎(chǔ)、主體驗(yàn)收自評(píng)報(bào)告的形式參考此格式,其內(nèi)容可根據(jù)實(shí)際施工情況進(jìn)行增減,絕不能照搬照抄,特此聲明。
北京易成市政工程有限責(zé)任公司××年×月×日
注:紅色的、打×的要根據(jù)項(xiàng)目部實(shí)際施工情況進(jìn)行調(diào)整、增減,絕不能照搬照抄。
第10頁(yè)共10頁(yè)
友情提示:本文中關(guān)于《建筑工程匯報(bào)總結(jié)ppt模板》給出的范例僅供您參考拓展思維使用,建筑工程匯報(bào)總結(jié)ppt模板:該篇文章建議您自主創(chuàng)作。
來(lái)源:網(wǎng)絡(luò)整理 免責(zé)聲明:本文僅限學(xué)習(xí)分享,如產(chǎn)生版權(quán)問(wèn)題,請(qǐng)聯(lián)系我們及時(shí)刪除。